Customization: | Available |
---|---|
After-sales Service: | 2-Year Warranty |
Warranty: | 2-Year Warranty |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Description |
Product name
|
Seamless Steel Pipe / Seamless Steel Tube
|
Standard
|
AISI ASTM GB JIS
|
Grade
|
API A106 GrB A53 GrB seamless steel pipe /ASTM A106 GrB A53 GrB steel tube
|
AP175-79, DIN215L, ASTM A106 GrB, ASTM A53 GB ASTM A179/A192/A213/A210 /370 WP91 WP11.WP22 DIN17440. DIN2448 JIS G3452-54
|
|
Length
|
5.8m 6m Fixed. 12m Fixed, 2-12m Random
|
Place of Origin
|
China
|
Brand Name
|
CXYS
|
Outside Diameter
|
1/2'-24
|
21.3mm-609.6mm
|
|
Technique
|
1/2.6': hot piercing processing technique
|
6'..24' hot extrusion processing technique
|
|
Usage /Application
|
Oil pipe line, Drill pipe, Hydraulic pipe. Gas pipe, Fluid pipe.Boiler pipe,Conduit pipe, Scaffolding pipe pharmaceutical and ship
building etc. |
Tolerance
|
±1%
|
Processing Service
|
Bending Welding. Decoiling. Cutting. Punching
|
Alloy Or Not
|
Is Alloy
|
Delivery Time
|
8-14 days
|
Material
|
API5L, Gr.A&B, X42, X46, X52, X56, X60, X65, X70, X80, ASTM A53, A106,A135,A252,A500, DIN1626,ISO559, ISO3183.1/2, KS4602,
GB/T911, 1/2, SY/T5037, SY/T5040, STP410, STP42 |
End
|
Bevel end(>2"), Plain (≤2"),with plastic cap, with screwed and socket
|
Surface
|
Black Painted, Galvanized, Natural Anticorrosive 3PE coated, polvurethane foam Insulation
|
Packing
|
Standard Sea-worthy Packing
|
Delivery Term
|
CFR CIF FOB
|
Production Process |
Packaging and Shipping Details |
Company Information |
FAQ |
Q1: What products can you offer?
A: We can offer you general steel types like 310S, 316L,304.304L.201,904L, 316H, 316,316L 300and
400 series, and duplex stainless steel like 2205, 2304,2101,2507,etc. 904L, 800H, 600H high-nickel alloy.
Q2. Can you produce the products according to my own drawings?
Yes,we can produce the products according to your drawings that will be most satisfy you.
Q3. How does your factory do regarding quality control?
Quality is priority. We always attach great importance to quality controlling from beginning to end.
Q4. Can I request to change the form of packaging and transportation?
Yes,We can change the form of the packaging and transportation according to your request,
but you have to bear their own costs incurred during this period and the spreads.
Q5. How does your factory do regarding quality control?
Quality is priority. We always attach great importance to quality controlling from beginning to end.
Q6. How long is the Delivery time?
A: 7~20 working days after confirming the payment.
If the order is urgently, we will push our workshop finish in advance.
Q7. What is your Payment?
A: 100% T/T advance , Western Union (For Small Order)
B: 30% T/T and balance 70% before the shipment
C: 100% Irrevocable LC at sight (For Big Order)